2003
Ford 2.3 /2.5L SOHC
Solid conversion insert installation
Disassemble head.
Hot tank and check for cracks.
Clean out hydraulic lifter bores.
Using “stud and bearing mount” press the inserts into the lifter bores, driving them down with ACE tool # 02003T.
Machine the top of the bosses parallel to and .500 inches above the rocker cover rail.
The top of the boss should be a minimum of 1.312 inches in diameter.
© Automotive Component Engineering 2009/2012
11/16/2011
Return to Instructions index