|
|
|
|
|
|
|
|
|
10150 |
|
|
Datsun V8 header
installation |
|
|
|
|
|
|
Package contents |
|
1 Right Header |
|
1 Left Header |
|
1 pr. Gaskets |
|
12 5/16” head, header bolts |
|
1 Reducer kit with
bolts & nuts |
|
2 large ACE decals |
|
|
|
|
Raise vehicle a
minimum of 24” |
|
|
|
|
Clean head surface of all
gasket material. |
|
|
Coat header gaskets. (Pam
/ High temp silicon recommended) |
|
|
Remove oil filter and
sparkplugs. |
|
|
Left side |
|
|
|
Pull fender well away
from frame, trim as needed. |
|
|
Remove # 1 & 7
cylinder tubes from header. |
|
|
Guide center section up
into place. |
|
|
Insert gasket, start
header bolts. |
|
|
Install front tube #1,
start bolts. |
|
|
Install rear tube #4 thru
fender well, start bolts. |
|
|
Tighten bolts from the
center out. |
|
|
Install spark plugs and
oil filter. |
|
|
Right side |
|
|
Pull fender well away
from frame, trim as needed. |
|
|
Remove # 1 cylinder tube
from header. |
|
|
Guide rear section thru
fender well into place. |
|
|
Insert gasket, start
header bolts. |
|
|
Install front tube and
start bolts. |
|
|
Tighten header bolts from
the center out. |
|
|
|
|
|
|
Install spark plugs.
Check routing of secondary wires. |
|
|
|
|
|
After reaching operating
temperature re-torque header bolts. |
|
|
|
|
|
Headers are coated with
Rustoleum high heat barbeque paint. |
|
|
|
|
|
|
NOTE;
Ceramic coated headers must be heat cycled, |
|
|
several times to prevent damage to
the coating. |
|
|
|
|
|
|
|
|
|